New annealer under construction…

Legs of annealer.

Legs of new annealer before the cross braces are welded on.

We are building a new annealer(s) to hook up to #3 and #4 on the GB4. The legs for the frame have been welded together. Next, we will square up the cross braces on the legs and weld them up. After that, we will stack the stainless steel tub on top. Fun.