Frame and casters on the ground…

We got the frame flipped over with the winch and re-attached the casters. We have to weld on some threaded rod to the frame in order to bolt on the tub. Should have that finished up tomorrow…

New annealer frame.

Legs, cross braces and casters of frame welded and flipped over.

Stainless steel tub.

Stainless steel tub we are using for the frame of the oven.

New annealer under construction…

We are building a new annealer(s) to hook up to #3 and #4 on the GB4. The legs for the frame have been welded together. Next, we will square up the cross braces on the legs and weld them up. After that, we will stack the stainless steel tub on top. Fun.

Legs of annealer.

Legs of new annealer before the cross braces are welded on.